The City of Dénia reports that from Monday 4 from September to Friday 29 from September the crossing of the level crossing from the Camí dels Lladres towards the c / Abu-L-Salt will be closed to traffic on the occasion of the works of assembly of the route in that section of Avd. Joan Fuster.
02 September 2017 - 00: 00