The City Council of Dénia continues with the work of removal of posidonia, which covered the Dianense coast after the sea storm last Tuesday.
The strong waves and the currents again took out of the water tons and tons of posidonia that piled up along the entire coast of Dénia. Yesterday, 160 tons had already been removed from Punta del Raset, Marineta Cassiana and El Trampolí, and during this morning 180 more tons were removed from Les Albarantes (40 tons), Les Marines (100) and La Almadrava (40).