Urbanism

The contributions of the neighbors agree with the proposals of the editorial team of PGE

January 31 from 2017 - 09: 19

Once the public participation process for the preparation of Structural General Plan Dénia has found that requests from neighbors are in line with proposals in which the equipment is working urban drafted the document. This was summed Councilwoman planning in the city of Dénia, Maria Josep Ripoll, during exposure to the public of the findings of participatory workshops.

As stated Ripoll, "There are no major conflicts with the ideas on the table", Showing a "important alignment between the aspirations of citizens and the proposals that have been worked on in the PGE".

So, from now on it has to incorporate the findings of participatory workshops to draft a preliminary version of the General Structural Plan, which will be presented to the public in order to discuss the proposals that eventually included.

Although the work of participatory workshops were focused on the development of PGE, Ripoll explained that the ideas that are taken are actions to perform over time in town, some actions "they will enrich the action of the government team".

Conclusions of participatory workshops

Since October there have been a total of ten participatory workshops, located in five municipalities. In total around 150 people participated in 20 hours of workshops have been conducted.

In the workshop The Xara it was concluded that the objectives for EATIM must strengthen the identity of the people, connecting the city center with the landscape and avoid confinement and escape the possibility that La Xara become a bedroom nucleus. This is intended to promote the idea of ​​people and fill it with life.

En Jesús Pobre It opted for the empowerment of rural landscape, conservation character of the urban core and enhancement of rural heritage and natural.

Workshop Marine Deveses He concluded with the need to link to Denia as a town through a major improvement of connections in the Cami de Gandia and the Carretera de Les Marines. Attendees pushed for better management of the Maritime Terrestrial Public Domain and the provision of equipment and infrastructure.

The next workshop was held in Rotes-MontgóIn which the neighbors demanded an improvement with infrastructures, better management of the Natural Park of Montgo and enhancement of natural and cultural heritage, as well as the organization of urban space.

The last workshop was held in Dénia, The broadest of all to cover the entire urban area of ​​the city. Of all the conclusions, highlighted the importance given to the creation of Ronda Perimetral or Via Park, but not in the form of road but as boulevard mode Anell Verd.

Participants at the workshop agreed on the need for social conquest between Denia and port; improving communications; the pedestrian; compact growth and the creation of a living, mixed and quiet Dénia.

Neighbors proposals to be incorporated into PGE

As a final conclusion, the team of participatory workshops explained that the neighbors are committed to controlled growth; Dénia closing with Via Parque (Ronda Perimetral old) as a boulevard (Anell Verd); management of historic centers with the fear of capital loss; sustainable urban mobility; diversification of the urban fabric and optimization of existing infrastructures.

Although the PGE is not the detailed document that allows establishing specific things to do in the city, from participatory workshops it has been extracted that citizens want a Montgó as a landscape reference, with better access and signaling and a recovery program for rainfed crops.

It also came to light that there will a network of green spaces in Les Marines, improving systems and bicycle and pedestrian connections connecting the coastal front through a greenway. Also, the neighbors want the Business Park expands and Dénia with a network of efficient transport.

Little political support

The meeting was attended by about a hundred people from associations, businesses and neighbors in general, but there was little political influx. Among the public was a large part of the government team and representatives of Podemos, but no one from the other opposition groups came.

From the Popular Party they explained that took the decision "due to the lack of respect and consideration of the government chaired by Vicent Grimalt, who at 15:20 pm has notified this group of said meeting". After this fact, the PP criticized "The attitude of those who talk about transparency and participation and that at the moment of truth, they are incapable of fulfilling what they said in their electoral program".

Leave a comment
This page is an optimized version for mobile devices. See original version.
Exit mobile version