The prefabricated classrooms that make up the Xara school have not withstood the rain that occurred last night and have been affected by the water. The power has gone out in a large part of the school and the plugs don't work. This is a problem that has already occurred on several occasions and is a great concern for the teachers of the center, since there are only six days before the start of classes.
Several of the classrooms, they will use next week children have been damaged by water. Part of school supplies for classes has been virtually unusable due to water that has been filtered through the walls and ceiling of the prefabricated classrooms.
One problem that comes from afar
It is not the first time that occur damage by water at this school. Students at the school have been using these prefabricated classrooms for seven years and are still waiting for the main school building, it closed since these classrooms were installed reformed.