GDCU - Politics

Opinion Pepa Font (GDCU): «A step forward»

29 July 2016 - 23: 55

That's the attitude you should take a team of government, to step forward, look to the future, leaving behind failed actions, which over time is proving that proved futile.

Again rises from the ashes the old aspiration of the Second Health Center Miguel Hernández, an issue that starts in March 2007, and has date, already have cost all dianenses near 7 million euros, moment. I say so far because there was still buy a small wedge of land on the site famous. Land that has cost us EUR 289.000,00 and 283,60 measures a whopping m2. Altogether a 5.000 m2 in lands that do not yet have the promised infrastructure and for which charters purchased.

But the truth is that from the beginning, everything has been done so nefarious, being at the end of pagans so clumsily, residents of Dénia. When the purchase is approved, already you warned that it could not perform in the manner that was being done, and finally the courts and corroborated. A few months after the plenary approval, 1ª transfer of land to the Generalitat Valenciana was proposed for the procedures for long-awaited installation began. Despite warnings Marina Salud that the land had to adjoin the Avd. Miguel Hernández, the only ones who did were transferred. And to make matters worse, the only municipal plot of land Tacaba Avd cited in 2015 the Popular Party built a playground with deficiencies that had to be ironed out six months later, and at this time, and thanks to its nonexistent area it is shade, is practically useless.

Now you want to correct the error and give 2007 land bordering Miguel Hernández, to promote the construction of the second health center. But ladies and gentlemen, we are in 2016 and the situation has changed radically, though certainly continue to require a health center in the north of Denia. Since the journey of this project started, there are several circumstances that have radically changed the health situation in our city. The disappearance of the Old Outpatient caused Marina Health, with the support of the Generalitat Valencia, transformed the former Hospital of La Pedrera Health Center and specialties. The expansion of facilities Pedrera not know anything.

But the most striking theme is that in the Five-Year Investment Plan Marina Salud 2014-2019 not have plans to build a new health center, or Dénia and Pedreguer, two of the planned investments in the concession .

So what's the point that we are debating 2016, buying land and loaning them if we know that will not do? Let's give real purpose to a "municipal" plot, lest we forget. So from Gent of Dénia - Center Unificat we propose that it be given a use according to the needs of our city.

In the explanatory meetings on the drafting of the future General Plan it was indicated that the quarry of the Castell would become a large parking lot, so facilities such as Urban Planning or Youth would take away from the current location, as well as the Baix La Reading Agency Sea and other activities of Llunàtics and Dinàmics that are currently being carried out.

If that really is the forecast of the PSPV and Compromis government team, with the support of CET (Podemos), from these lines we propose the following action in the field of Miguel Hernández.

In a first 2500 m2 sector without access Avenue:

1.- Social housing construction is projected, due to the large number of needy families and owed to solve their housing problems. Few actions have been taken since a year ago, we adopted antidesahucios measures, and the Joint Committee for Social Housing will be promoted. Nor it has called the Covenant or the Joint Committee. This would be a real and powerful measure that would solve a latent lack in our city.

2.- Allocate the entire ground floor of the building to install the Department of Planning and Environment, equipping it with modern facilities commensurate with the needs of two very important for the daily life of dianenses, especially the Department of Environment departments.

In the second sector also 2.500 m2, with access from Avenue:

1.- the construction of new facilities is drafted to accommodate the needs of Llunàtics and Dinamics and facilities of the Department of Youth. This project could include installing a small room-auditorium with reduced capacity (no more than 400 people), several exhibition halls and the Reading Agency Baix La Mar.

2.- A diaphanous installation was designed as a multipurpose room, which would accommodate all those activities that often for lack of space on the public road or weather inclemencies can not be done outdoors. This room could be used for fairs, meetings, etc ...

Surely this proposal will in the drawer of oblivion, but we must stop looking to the past and be realistic, noting what the current needs of the city and allow ourselves to make toast to the sun, giving five minutes of glory, but contribute little to dianenses.

Pepa Font Reus
Gent spokesman Denia-Center Unificat

Leave a comment
This page is an optimized version for mobile devices. See original version.
Exit mobile version