Tourism

Denia historic center: it was so and so

August 09 from 2011 - 10: 44

The 1 October DéniaFutur work began, financed by the city of Dénia (30%) and the European Regional Development Fund (ERDF) of the European Union (70%) with a total budget of EUR 6.003.450. The Plaza de la Constitucion, Plaza del Consell and tunnel Castillo objects have been remodeling.

Ten months after the start of these works, on Saturday August 6, the new spaces being more accessible, removing architectural barriers and adding new tree species and new leisure spaces were opened.

Traffic has been removed from the Constitution Square and remodeled the Castle tunnel, which now features a more futuristic look with iron panels that serve as a framework for art exhibitions. Plaza del Consell, but has called stage space has gained in capacity to the public.

Now we just have to get used to the new look offered by the center of Denia. Criticized and praised, the results have not left anyone indifferent. And you, criticism or praise?

See 9 comments
This page is an optimized version for mobile devices. See original version.
Exit mobile version