Local Police Dénia has reported that, during the works for the installation of underground medium voltage network between the electrical substation Assagador del Palmar and the Center for Transformation Camí de Santa Llúcia that it will carry out Iberdrola, and during the expected term of one month, it is closed to traffic from the Assagador del Palmar electrical substation to the Camí Vell de Pego to Denia.
This court joins the closure to traffic on Camí Vell de Pego from Assagador del Palmar to CV-724 (Alcanalí road to the beach).